Linde-Griffith Construction

projects

MetLife Stadium

Linde-Griffith mobilized 6 crews for the development of Metlife Stadium totaling 4.5 million man hours. Linde-Griffith installed over 4,000 pipe piles for the home stadium of the Super Bowl XLVII champions.